Site Visit: 6-1-05 Entrance Footing

Site Visit: 6-1-05 North Pod Main Utility Trench 1

Site Visit: 6-1-05 North Pod Main Utility Trench 2

Site Visit: 6-1-05 Stored Masonry Materials

Site Visit: 6-1-05 North Pod Art Room Drains

Site Visit: 6-1-05 North Pod Bathroom Drain

Site Visit: 6-1-05 North Pod Bathroom Vents

Site Visit: 6-1-05 North Pod Drains 1

Site Visit: 6-1-05 North Pod Drains 2

Site Visit: 6-1-05 Stored Pipe

Site Visit: 6-1-05 South Pod Post Pour With South Wall Block Out

Site Visit: 6-1-05 Transformer Vault Cover

Site Visit: 6-8-05 South Pod Main Terminal Rough In 1

Site Visit: 6-8-05 South Pod Main Terminal Rough In 2

Site Visit: 6-8-05 North Pod Conduit Homeruns 1

Site Visit: 6-8-05 North Pod Conduit Homeruns 2

Site Visit: 6-8-05 North Pod Art Room Drain Clean Out

Site Visit: 6-8-05 Electrical Room Conduit

Site Visit: 6-8-05 North Pod Transformer Vault

Site Visit: 6-8-05 South Pod Drain Clean Out

Site Visit: 6-8-05 South Pod Bathroom Drains

Site Visit: 6-13-05 South Pod Geo Exchange Well Field Rough In 1

Site Visit: 6-13-05 South Pod Geo Exchange Well Field Rough In 2

Site Visit: 6-13-05 South Pod Electrical Conduit

Site Visit: 6-13-05 South Pod Drain Clean Out

Site Visit: 6-13-05 North Pod Conduit Homeruns

Site Visit: 6-13-05 Commons Area Conduit

Site Visit: 6-13-05 North Pod Electrical Room Compaction

Site Visit: 6-13-05 North Pod Solar Wind Conduit

Site Visit: 6-13-05 South Pod Telephone Terminal 1

Site Visit: 6-13-05 South Pod Telephone Terminal 2

Site Visit: 6-17-05 North Pod Electrical Room

Site Visit: 6-17-05 South Pod Floor Boxes 1

Site Visit: 6-17-05 South Pod Floor Boxes 2

Site Visit: 6-17-05 South Pod Floor Boxes 3

Site Visit: 6-17-05 South Pod Floor Boxes 4

Site Visit: 6-17-05 South Pod Gravel Compaction

Site Visit: 6-17-05 North Pod Gravel Compaction 1

Site Visit: 6-17-05 North Pod Gravel Compaction 2

Site Visit: 6-17-05 North Pod Gravel Compaction 3

Site Visit: 6-17-05 North Pod Acid Basin and Plumbing

Site Visit: 6-22-05 North Pod Acid Basin and Plumbing

Site Visit: 6-22-05 South Pod Floor Boxes 1

Site Visit: 6-22-05 South Pod Floor Boxes 2

Site Visit: 6-22-05 South Pod Floor Boxes 3

Site Visit: 6-22-05 South Pod Floor Boxes 4

Site Visit: 6-22-05 South Pod Floor Boxes 5

Site Visit: 6-22-05 South Pod Floor Boxes 6

Site Visit: 6-22-05 South Pod Floor Boxes Conduit 1

Site Visit: 6-22-05 South Pod Floor Boxes Conduit 2

Site Visit: 6-22-05 Steel Package 1

Site Visit: 6-22-05 Steel Package 2

Site Visit: 6-23-05 North Pod Floor Boxes

Site Visit: 6-23-05 North Pod Science Room Water Compaction

Site Visit: 6-23-05 South Pod Slab Mesh 1

Site Visit: 6-23-05 South Pod Slab Mesh 2

Site Visit: 6-23-05 Steel Package 1

Site Visit: 6-23-05 Steel Package 2

Site Visit: 6-23-05 Steel Package 3

Site Visit: 6-23-05 Steel Package 4

Site Visit: 6-23-05 Steel Package 5

Site Visit: 6-23-05 Steel Package 6

Site Visit: 6-24-05 North Pod Floor Boxes 1

Site Visit: 6-24-05 North Pod Floor Boxes 2

 

current projects
PAST PROJECTS
message board

 

acc project

project contacts
links
meetings and reports

leed

schedule
design and photos

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Seth Carson, Architectural Engineer, E.I.T., Owner.
Copyright © 2005 Bluefeather Design/Build. All rights reserved.
Revised: 06/27/05.