Photos From ACC Job Site During October 2005
Prepared
by Seth A. Carson
Site Visit:
10-5-05 Electrical Room 1
Site Visit:
10-5-05 Electrical Room 2
Site Visit:
10-5-05 Electrical Room 3
Site Visit:
10-5-05 South Pod Sun Shade
Site Visit:
10-11-05 Electrical Room 1
Site Visit:
10-11-05 Electrical Room 2
Site Visit:
10-11-05 North Pod Art Room Rough In
Site Visit:
10-11-05 North Pod Duct Cover 1
Site Visit:
10-11-05 North Pod Duct Cover 2
Site Visit:
10-11-05 North Pod Parapet 1
Site Visit:
10-11-05 North Pod Parapet 2
Site Visit:
10-11-05 North Pod Temporary Gas Meter
Site Visit:
10-11-05 North Pod Outside Electrical Room
Site Visit:
10-11-05 South Pod Sun Shades
Site Visit:
10-16-05 Commons Area Sprinkler
Site Visit:
10-16-05
Curb and Gutter 1
Site Visit:
10-16-05
Curb and Gutter 2
Site Visit:
10-16-05
Curb and Gutter 3
Site Visit:
10-16-05
Curb and Gutter 4
Site Visit:
10-16-05
Curb and Gutter 5
Site Visit:
10-16-05
Front Entry
Site Visit:
10-16-05 HVAC Piping 1
Site Visit:
10-16-05 HVAC Piping 2
Site Visit:
10-16-05 HVAC Piping 3
Site Visit:
10-16-05 HVAC Piping 4
Site Visit:
10-16-05 Parking Lot Conduit 1
Site Visit:
10-16-05 Parking Lot Conduit 2
Site Visit:
10-16-05 Parking Lot Conduit 3
Site Visit:
10-16-05 Parking Lot Grading
Site Visit:
10-16-05 Renewable Energy Parking Lot Conduit 1
Site Visit:
10-16-05 Renewable Energy Parking Lot Conduit 2
Site Visit:
10-16-05 Turnaround
Site Visit:
10-21-05 Art Lab Roof-In
Site Visit:
10-21-05 Concrete 1
Site Visit:
10-21-05 Concrete 2
Site Visit:
10-21-05 Earthwork 1
Site Visit:
10-21-05 Eco Shingle 1
Site Visit:
10-21-05 Eco Shingle 2
Site Visit:
10-21-05 Fire Mechanical Room
Site Visit:
10-21-05 Light Post 1
Site Visit:
10-21-05 Main Electrical Room 1
Site Visit:
10-21-05 Main Electrical Room 2
Site Visit:
10-21-05 Science Lab
|