Shawver Project |
|
|
Welcome, First Consultation 2h Mon 10/4/04 Mon 10/4/04 Site Visit and Measurement 2h Mon 12/6/04 Mon 12/6/04 Enter Measurement into CAD 3.5h Sun 12/12/04 Sun 12/12/04 Second Consultation 3h Thu 12/16/04 Thu 12/16/04 Project Planning Phase 96d Thu 12/16/04 Thu 4/28/05 Outline Project Schedule 1d Thu 12/16/04 Thu 12/16/04 Space Planning 2w Thu 12/16/04 Wed 12/29/04 Concept Drawings 2w Thu 12/30/04 Wed 1/12/05 Schematic Drawings 4w Thu 1/13/05 Wed 2/9/05 Preliminary Cost Estimate 2d Thu 2/10/05 Fri 2/11/05 Construction Documents 36d Mon 2/14/05 Mon 4/4/05 Quality Specifications 1d Mon 2/14/05 Mon 2/14/05 Performance Specifications 2d Mon 2/14/05 Tue 2/15/05 Materials Specifications 21d Mon 2/14/05 Mon 3/14/05 Final Plans Drawings 14d Tue 3/15/05 Fri 4/1/05 Final Cost Estimate/Budget Established 1d Mon 4/4/05 Mon 4/4/05 Contractor Selection 13d Tue 4/5/05 Thu 4/21/05 Bid Out of Major Sub-Contractors 2w Tue 4/5/05 Mon 4/18/05 Selection of Sub-Contractors 1d Tue 4/19/05 Tue 4/19/05 Scheduling of Contractors 2d Wed 4/20/05 Thu 4/21/05 Ordering of Materials 2d Fri 4/22/05 Mon 4/25/05 Windows 1d Fri 4/22/05 Fri 4/22/05 Exterior Doors 1d Fri 4/22/05 Fri 4/22/05 Roof and Siding 1d Fri 4/22/05 Fri 4/22/05 Order Lumber Package 2d Fri 4/22/05 Mon 4/25/05 Order Roof Trusses 1d Fri 4/22/05 Fri 4/22/05 Order Drywall 1d Fri 4/22/05 Fri 4/22/05 Permitting 19d Mon 4/4/05 Thu 4/28/05 Submit Plans for City Review 14d Mon 4/4/05 Thu 4/21/05 Plan Revisions 5d Fri 4/22/05 Thu 4/28/05 Project Building Phase 113d Mon 5/30/05 Wed 11/2/05 Move Out Period 7d Mon 5/30/05 Tue 6/7/05 Staging 1d Wed 6/8/05 Wed 6/8/05 On-Site Dumpster 1d Wed 6/8/05 Wed 6/8/05 On-Site Toilet 1d Wed 6/8/05 Wed 6/8/05 Site Work Phase 20d Wed 6/8/05 Tue 7/5/05 Call for Locates 1d Wed 6/8/05 Wed 6/8/05 Excavation for New foundation and Utilities 5d Thu 6/9/05 Wed 6/15/05 Footings 3d Thu 6/16/05 Mon 6/20/05 Foundation 8d Tue 6/21/05 Thu 6/30/05 Backfill 2d Fri 7/1/05 Mon 7/4/05 Garage Slab 1d Tue 7/5/05 Tue 7/5/05 Demolition 38d Wed 6/8/05 Fri 7/29/05 Demolition and Gut Out of Interior Nest 1.5w Wed 6/8/05 Fri 6/17/05 Demolition and Gut Out of Exterior Nest 1w Wed 7/6/05 Tue 7/12/05 Demolition of Garage 2d Thu 6/9/05 Fri 6/10/05 Tear Off of Nest Roof 4d Tue 7/26/05 Fri 7/29/05 Framing 14d Wed 7/6/05 Mon 7/25/05 Garage Walls 2d Wed 7/6/05 Thu 7/7/05 Loft Floor 3d Fri 7/8/05 Tue 7/12/05 Loft Walls 4d Wed 7/13/05 Mon 7/18/05 Loft Roof 1w Tue 7/19/05 Mon 7/25/05 New Nest Walls 5d Wed 7/13/05 Tue 7/19/05 Roofing 2w Mon 8/1/05 Fri 8/12/05 Exterior Doors and Windows 3d Mon 8/15/05 Wed 8/17/05 Plumbing 43d Mon 8/15/05 Wed 10/12/05 Plumbing Rough In 8d Mon 8/15/05 Wed 8/24/05 Set Fixtures 3d Mon 10/10/05 Wed 10/12/05 Electrical 43d Mon 8/15/05 Wed 10/12/05 Electrical Rough In 8d Mon 8/15/05 Wed 8/24/05 Installation of Fixtures 3d Mon 10/10/05 Wed 10/12/05 HVAC 2w Mon 8/15/05 Fri 8/26/05 Insulation 1w Mon 8/29/05 Fri 9/2/05 Drywall 1.5w Mon 9/5/05 Wed 9/14/05 Painting 1.5w Wed 9/14/05 Fri 9/23/05 Trim and Millwork 28d Mon 9/26/05 Wed 11/2/05 Install Interior Doors 3d Mon 9/26/05 Wed 9/28/05 Millwork in Loft Office 3w Thu 9/29/05 Wed 10/19/05 Built In Cabinetry 2w Thu 9/29/05 Wed 10/12/05 Kitchen and Bathrooms 2w Mon 9/26/05 Fri 10/7/05 Flooring 2w Thu 10/20/05 Wed 11/2/05
|
|
| planning | |
| construction | |
| photos | |
| schedule | |
| message board | |
|
|
|
Seth Carson Architectural Engineer, E.I.T., Owner.
|
|